ORLANDO, FL

Concrete Removal in Orlando, FL

Full-service concrete demo and haul-off, priced by the square foot.

Concrete Removal from Javi's Dumpster Services costs $1.50 to $2.00 per square foot in Orlando and Central Florida, with break-up, loading and haul-off included. Full-service concrete demo and haul-off, priced by the square foot. Concrete is fine in the 10 yard; in a 15 yard or larger it adds $150. Call (407) 860-8640 or get a quote online.

Concrete goes in the 10 yard at no extra charge — that box is built for heavy debris. In a 15 yard or larger, concrete and heavy debris carry a $150 handling charge, because the weight is too much for the bigger box and the truck — keep the load below the marked fill line, and anything over the included tonnage is billed at $83 per ton. That's why the concrete job is its own service.

Full service means Javi's brings the skid steer and breakers, breaks up the driveway, sidewalk, patio or slab, loads the concrete container, and hauls it. It's priced by the square foot: $1.50 to $2.00 per square foot depending on thickness, rebar and access. Measure the slab, multiply, and you have the range before you call. The site is left raked and ready for the new pour or the new sod.

The details

  • Driveways, sidewalks, patios, pool decks, slabs
  • $1.50–$2.00 per square foot, break-up and haul included
  • Loaded below the marked fill line; overweight billed at $83 per ton
  • 10 yard takes concrete at no extra charge; in a 15 yard or larger it's a $150 charge
  • Skid steer, breakers and saws on the crew

Published prices

$1.50–$2.00

per square foot

Break-up, loading and haul-off included. Range depends on thickness, rebar and access. Concrete goes in the 10 yard at no charge; in a 15 yard or larger it carries a $150 handling charge.

Ready for a number?

Get a quote, book online in two minutes, or call. Same-day requests by 2:00pm.

Same-day and next-day dumpster delivery available. Same-day requests must be in by 2:00pm and are subject to availability.